Write an evaluation paper based on the 1976 Montreal Olympics: Case Study of Project Failure.

Write an evaluation paper based on the 1976 Montreal Olympics: Case Study of Project Failure.

  • Analyze the key mistakes made with the use of the 5 essential elements of project management
  • Explain what actions should have been taken to ensure the 5 essential elements of project management were used properly
  • Evaluate (defend or prosecute) the quality assurance measures during and after construction
  • Identify and calculate the key mistakes that could have significantly reduced costs
  • Describe the key stakeholders, and assess their motives and risks taken