Develop a diagram showing network planning techniques, in which you use the program evaluation and review technique (PERT) and the critical path method (CPM).

worth 320 points

 

Using the same scenario from Assignment 1, present the following findings to your Chief Executive Officer.

 

Create a presentation in a common format (PowerPoint or a similar program) with a minimum of twenty (20) slides and corresponding speaker notes in which you:

 

  1. Determine which statistical technique you will employ to measure the quality characteristics of your organization. Provide examples to support the rationale.
  2. Analyze the current facility location, and then use the three-step procedure to determine a new location.
  3. Analyze the key concepts related to capacity planning and facility location for the new location.
  4. Examine the current work system design, and determine your organization’s selected feasibility in the job design (i.e., technical, economic, behavioral). Assess key elements of the rationale in the work design competitive advantage.
  5. Using the method analysis described in the textbook, defend the new change implementation process and the rationale for the change of method.
  6. Develop a diagram showing network planning techniques, in which you use the program evaluation and review technique (PERT) and the critical path method (CPM).
  7. Use at least three (3) quality academic resources in this assignment. Note: Wikipedia and other Websites do not quality as academic resources.

 

Your assignment must follow these formatting requirements:

 

  • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
  • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
  • Include corresponding speaker notes for each slide included in the presentation.

 

The specific course learning outcomes associated with this assignment are:

 

  • Apply descriptive statistics to measure quality characteristics.
  • Analyze the key concepts related to capacity planning and facility location.
  • Examine the key elements of work system design, the project life cycle, and project management.
  • Use technology and information resources to research issues in operations management.
  • Write clearly and concisely about operations management using proper writing mechanics.

 

Grading for this assignment will be based on answer quality, logic / organization of the paper, and language and writing skills. Click here to access the rubric for this assignment.

Place a similar order with us or any form of academic custom essays related subject and it will be delivered within its deadline. All assignments are written from scratch based on the instructions which you will provide to ensure it is original and not plagiarized. Kindly use the calculator below to get your order cost; Do not hesitate to contact our support staff if you need any clarifications.

Whatever level of paper you need – college, university, research paper, term paper or just a high school paper, you can safely place an order.


Last Completed Projects

# topic title discipline academic level pages delivered
6
Writer's choice
Business
University
2
1 hour 32 min
7
Wise Approach to
Philosophy
College
2
2 hours 19 min
8
1980's and 1990
History
College
3
2 hours 20 min
9
pick the best topic
Finance
School
2
2 hours 27 min
10
finance for leisure
Finance
University
12
2 hours 36 min